NCGR Corvallis - Pyrus Germplasm |
Please use the GRIN-Global search page to locate and order scionwood:
(https://npgsweb.ars-grin.gov/gringlobal/search.aspx?
Scionwood orders are accepted between September 1 and January 25.
You must check the "include unavailable" box in the search screen to retrieve accession data at other times.
Download an Excel spreadsheet listing all clonal pear accessions here (updated 25 Sept. 2017)
Download a Pear Germplasm Collection summary here.