Skip to main content
ARS Home » Office of Communications » Images » Photos » Oct13 » d3005-1


Download a high-resolution (300dpi) digital image here.

Image Number D3005-1

Construction of a blind inlet. Septic tiles are placed on top of a layer of coarse limestone gravel, covered in a second layer of gravel, encased in landscape fabric, and backfilled with coarse soil to facilitate infiltration.

 

Photo by Stan Livingston.


640 pixels wide: (d3005-1.jpg)




Please visit our Image Gallery