Little Topashaw Creek - Channel Stabilization - Thalweg |
Channel surveys 9 to 12 months following construction indicated an average of 0.3 m of additional thalweg incision had occurred, with greatest incision (~0.6 m) in the middle and upstream from the study reach. Mean top width was unchanged.