Skip to main content
ARS Home » Southeast Area » Oxford, Mississippi » National Sedimentation Laboratory » Water Quality and Ecology Research » Docs » Coldwater River Backwater Restoration - Rehabilitation of cutoff bend

Coldwater River Backwater Restoration - Rehabilitation of cutoff bend
headline bar

Project features

An existing cutoff bend was subdivided into a lake cell and a wetland cell by constructing two low weirs, each equipped with simple flashboard type drainage control structures. Placement of the weirs allowed holding more water through the drier summer and fall months. Also, runoff from cultivated fields was diverted away from the lake cell and into the wetland.

Longitudinal profile of rehabilitated backwater

Managed wetland


Managed Wetland


Floodplain Lake



Back to Coldwater Restoration Home